Maximize reservoir contact

A holistic approach that adds value over the entire well life cycle

We help maximize reservoir contact to optimize productivity and maintain maximum well delivery. Our unique completion technologies provide a new perspective to drilling and completing wells, adopting a holistic approach which adds value continuously over the life cycle of a well. 

From reducing geological uncertainty, accelerating the first production, minimizing CAPEX, reducing costs, and simplifying plug & abandonment. The impact of our approach is immediate and has proven to provide substantial savings.

Zonal control and isolation

Common for many of our clients is that they are challenged by cost pressure, geological uncertainty or unforeseen external events that require new ways of building new wells that ensure the highest net present value possible. We help solve complex tasks from extended reach horizontal reservoir sections to designing lower completion for highly deviated reservoir sections. 

To help increase the value of their assets, we leverage different solutions, all based on our unique metal expandable technology, that enable operators to maximize reservoir contact whilst ensuring well integrity.

Our zonal isolation solutions help compartmentalize the reservoir into many, discrete sections. This gives the operator the best options to mitigate reservoir uncertainties and maximize well value. Similarly, our zonal flow control enables changing reservoir conditions over the life of the well to maintain maximum well delivery.

Cementless completion

Welltec completion technologies can eliminate or reduce the need for cementing operations. This not only enhances well integrity but also contributes to a 10-15% reduction in operating time, while also reducing risk and greenhouse gas emissions from cementing operations. 

Cementless completions also: 

  • Decrease risks of cement spills in open water 
  • Reduce cement clean-out in rig piping systems
  • Eliminate clean-out of contaminated tanks and pits 
  • Cuts the need to ship contaminated water ashore
  • Reduce the weight of supply boats burning fuel

The Welltec Annular Isolation (WAI) enables 100% cement removal and water cut isolation across a laminated reservoir, via a unique packer perforation capability.

Eliminate methane emissions

Methane emissions prevention is synonymous with reliable well integrity, and the elimination of Sustained Casing Pressure (SCP).

Welltec® has installed patented completion products in more than 1,000 wells across the globe, establishing an impeccable track record in helping its partners address these important environmental challenges.

Welltec offers a full range of industry-leading metal expandable packers.  These unique products are all designed, engineered, and manufactured in-house.

The V0 WAB range is qualified to the highest validation level within industry standards – IS01410 V0 – ensuring a gas-tight seal and life-of-well barrier against SCP, in turn preventing methane and other GHG emissions.

Challenges

Get in touch

800 X 450Px Chum Wai Hoe 2022
Chum Wai Hoe
Vice President WCS Sales