Access to lateral sections
Developed for today’s multilateral wellbores, Welltec Lateral Intervention Tool conveys toolstrings into laterals, reliably and efficiently.
Using a number of sensors, the tool identifies where the lateral is and indexes itself so that as it drives forward it enters the lateral.
It is fully combinable with 3rd party logging tools so that it can convey the appropriate service to fully understand the previously inaccessible lateral wellbore.
Featured case
A client in the Middle East needed to perform production logging on a multilateral gas well. The well was drilled in 2013 and included three slim open-hole laterals. In early...
The Welltec Lateral Intervention Tool is the latest advancement in conveyance and deployment tools from Welltec. It has been designed to address the challenges of intervening in multilateral, maximum reservoir contact wells.
The tool provides access to lateral sections by detecting the window, shifting a steerable joint and directing the toolstring into the window. Combinable with the Well Tractor® as well as 3rd party e-line tools, it provides the operators the capability to enter and evaluate their laterals with a host of e-line technology, illuminating understanding of the well and the reservoir.
Applications |
Production logging |
Cement bond logging |
Seismic measurement |
Fluid sampling |
Mechanical solutions |
Pipe recovery |
Depth determination |
Features |
E-coil or e-line deployed |
On-board measurements |
Wireless bridge telemetry |
Passive fail-safe system |
Surface read-out compatible |
Logging while tractoring |
Universal through wiring |
NACE compliant |
Benefits |
Directs 3rd party tools into laterals |
Confirms which lateral entered |
No thru-wiring of 3rd party tools |
Optimal data acquisition |
OH or CH application |
Large range of ID’s accessible |
Operates on any e-line via DC |
Specifications | |
Tool OD | 2 1/8” |
Length | 14.1ft - 35 ft* |
Weight in air | 86 lbs – 194 lbs* |
Max.wellbore ID above lateral junction | 8.5” |
Min. deviation at lateral junction | 30° |
Maximum well pressure | 20,000 psi |
Maximum well temperature | 257-302F* |
Tensile strength | 36,000 lbs |
Compressive strength | 30,000 lbs |
* | Dependent upon configuration |
Talk to your local expert
At Welltec, our team of specialists is experienced in resolving the unique challenges of well drilling and operations across diverse terrain. Whatever your need, we can help you find a solution.