Complete Focus Sept 2Nd 2020

Contact

Kevin Wood
+966 508399932

Watch the full video

If you’ve already signed up, you can watch the full recording of any of our webinars using the password from your confirmation email.
If you need a password, please contact Welltec:

#3 WAB® for Multistage fracturing

Date: 02/09/2020

Why do we need reliable isolation during fracturing?

Ensuring zonal isolation during a high-pressure multi-stage fracturing with conventional wellbore isolation technologies has several challenges. Maintaining high differential pressure ratings in a washed-out wellbore can lead to communication between zones and packer failure. Incorrect packer placement and lack of anchoring can lead to high axial loading creating buckling of the completions string. And finally, inability to rotate can often mean not reaching target depth.

Watch the full video