BACKGROUND

An operator was having problems with a wireline retrievable safety valve assembly impeding production in a vertical, cased hole oil well in Nigeria. The valve failed to seat properly in the tubing and flowed up hole with production to get stuck somewhere near the tubing hanger; precise position unknown. The operator had made several slickline attempts to jar the fish free. The first of these involved more than 200 strokes in each direction using 2 1/2” heavy sinker bars, accelerator and a spring loaded jar with a pulling tool latched into the lock mandrel fish neck. When this was unsuccessful, another slickline attempt was made using a blind box on top of the inner packing mandrel sleeve to attempt to land the blows below the keys. In total, more than 1,000 strokes were made.

During the last phase, indicators showed that the lock mandrel fish neck was partially open, suggesting that its keys were jammed in a slightly inclined position, below the lower ID (4.795”) of the tubing hanger profile. The operator then turned to the contingency of using CT to perform a cut using sand erosion. But with little progress and lack of precision control they decided to engage Welltec® to mill out the obstruction and save the completion string.

OPERATION

Based on the unique problem description, Welltec engineered a custom solution consisting of a Well Tractor®, Well Stroker®, Well Miller® and a variety of bits. The plan, as designed, was to mill through the safety valve in stages to remove the inner mandrel sleeves. This in turn would release the springs that were holding the dogs and subsequently dislodge the valve. A System Integration Test (SIT) was conducted beforehand to confirm the solution for this project’s objective. Using the Well Tractor and Well Miller plus custom nipple milling bit in combination with the Well Stroker the team succeeded in milling out the safety valve as planned during the SIT. The safety valve fell to the bottom of the well as desired, restoring access and production.

ACHIEVEMENTS

This successful milling operation enabled the operator to avoid having to pull the entire completion string and saved more than USD 2 million compared to the alternatives. The operator was very pleased to be able to regain the well in a shorter time frame and estimated that the milling solution was twice as efficient as the other options.

Tools Applied

  • Well Miller®

    Deployed on e-line, our modular milling tools have proven to be robust and highly effective in removing well components that are malfunctioning or no longer required with robotic precision.

    Read more
  • Well Stroker®

    The Well Stroker can push or pull multiple times in the same run irrespective of the depth and deviation. It delivers up to 100,000 lbs of axial force downhole by the use of a bi-directional hydraulic ram.

    Read more
  • Welltec Release Device®

    Welltec Release Device (WRD) is a simple tool which adds versatility and risk reduction to the operation. It provides predetermined locations in the toolstring where it can be parted, should it become stuck.

    Read more
  • Well Tractor®

    The Well Tractor® was regarded as a revolution in the industry when it was introduced in the 1990’s. It enables operators to extend the reach of traditional e-line deployment into highly deviated and horizontal wells.

    Read more