Tubing remediation enables production from new intervals

Welltec Springblade Patch previous Isealate
3,300 m

Patch setting depth

46.5 hrs

Total operation time

2

Two ½” punched holes isolated and sealed

4 mm

Tubing ID reduction

Synopsis

When an operator in Southern Europe required a cost-effective solution to isolate two ½-inch punched holes in a 4-1/2” production tubing, a Welltec® Springblade Patch was deployed and set via wireline, then successfully pressure tested within a total operational time of 46.5 hours.

The solution provided a reliable seal with minimal impact on tubing inner diameter, enabling the operator to efficiently progress their well intervention program toward production from new intervals.

The successful outcome generated strong client interest in applying the technology in future operations.

Challenge

Production tubing remediation

Solution

Welltec® Springblade Patch

Location

Southern Europe

Conditions

Well type: Vertical oil producer kicking off to horizontal liner across lower reservoir
Max. temp: 82°
Max. pressure: 250 bar